March 14th Construction Update (New Photos!)

After a couple of weeks of slow-down waiting for door frames, the work at 8743 E Pecos Rd is hopping again. Most noticeably, we’re starting to see pieces of the OSB wood get installed. It’s a fairly involved process of sanding, staining, and finishing, but the finished product looks great.

Here are some of the latest photos:

New drywall 'boxes' around the main entrances to The Box

Portions of the OSB going up (not finished)

In The Box with portions of the exterior wall covered in OSB

Down the classroom hallway. Drywall and door/window frames are in.

Wall tile in bathroom (with cool design / layout)

Office space with window into break room

 

Advertisements

,

3 Comments

January 6 Construction Update (New Photos!)

Work continues to progress on 8743 E Pecos and the Beyond project, as more wall frames have gone up, much of the HVAC ducts are getting installed, and a few skylights have been punched in the ceiling. It is very cool to see the space change each week!

Also, having the work take place indoors allows us to keep going even when there’s inclement weather (though the fierce wind last week beat the heck out of our “Future Home of Second Mile” sign).

Soon many people will be gathering here to exalt the name of Jesus!

, ,

Leave a comment

Construction Update (New Photos!)

After months of planning, praying, and all kinds of other work, the building at 8743 E Pecos Rd is now under construction. It’s an empty shell that we are building out as a space for worship, hosting community events, and proclaiming the good news of Jesus to all who enter.

You can see that the framing for the interior walls is starting to go up, and you’ll also see a picture of the interior black ceiling lining that will provide sound absorption in The Box (for a look at the design of the space, click here).

, ,